ONE crew excavating a bioremediation pit for contaminated soil

Phase I. Phase II. Closure.

Phase I ESAs That Find What Others Miss

ASTM E1527-21 reports completed under the oversight of our technical director, a licensed Professional Geologist. If we flag a problem, we scope it, price it and get your deal to closing.

  • ASTM E1527-21
  • PG oversight
  • Phase I to closure

NEXT DAY RESPONSE

Get a Phase I quote

  • Fixed-scope, fixed-fee quote
  • ASTM E1527-21 compliant reports
  • Timed to your closing date
Geologist examining soil core samples on an industrial site

A Phase I that missed something is the most expensive report you'll ever buy.

Included in every ONE Environmental Phase I:

Deep records research

Sanborn maps, directories, aerials and regulator files, not just a database pull.

Every data gap flagged

Missing history is called out clearly, with how it affects your risk.

Recommended next steps

If further work is warranted, you get a proposed scope, cost and timeline.

ASTM E1527-21, done thoroughly

What we check

Every item below is required by ASTM E1527-21. The difference is how thoroughly it gets done. Some firms gloss over sections the standard requires; we don't.

  1. 01

    Historical records

    Sanborn maps, city directories, aerials, regulatory files

  2. 02

    Site reconnaissance

    Walked by experienced field staff

  3. 03

    Interviews

    Owners, occupants, local officials

  4. 04

    Vapor encroachment screening

    Could vapors migrate onto the site?

  5. 05

    Plain-English findings

    Likely cost and next steps included

  6. 06

    Lender & AAI defensible

    Meets CERCLA All Appropriate Inquiries

Full-Lifecycle Partners

Dirty site, still want it?

Don't just find the risk. Know what it'll cost you and how to fast-track resolution.

  1. 1
    Phase I site walk at a commercial property

    Phase I ESA

    We find what others miss.

  2. 2
    Drill rig collecting soil samples

    Phase II Site Investigation

    Soil, groundwater and soil-vapor sampling, with findings before closing.

  3. 3
    Bioremediation pit treating contaminated soil

    Remediation & Regulatory Compliance Fit

    We match the site to the right regulatory program: voluntary remediation, brownfields, dry cleaner programs and more. Plus vapor mitigation (VIMS/SSDS) and UST closures.

  4. 4
    Worker at a redeveloped industrial plant

    Risk Management

    We manage the risk through the right program, working toward closure or long-term monitoring, so your deal proceeds.

One environmental partner, from Phase I to closure.

How we compare

Same report, done better.

Comparison of Phase I providers
ONE Environmental
Research depthYes
PG oversightYes
Local regulator knowledgeYes
Phase II & remediation in-houseYes
Single point of contactYes
PriceTypically less than national firms

Results

Sites we've taken to closure

46

sites in 48 hours

Portfolio speed without cutting corners.

Former refinery, Charlotte NC

Former refinery, Charlotte NC

Brownfield redevelopment of a petroleum refining site.

Furniture plant, Martinsville VA

Furniture plant, Martinsville VA

UST closure at a former manufacturing site.

Former dry cleaner, Virginia

Former dry cleaner, Virginia

Taken through the Voluntary Remediation Program.

15-property portfolio

15-property portfolio

Phase I ESAs across five states.

Who we work with

  • Buyers & Investors
  • Lenders
  • Attorneys
  • Developers
  • M&A & Roll-up Acquirers
  • Industrial Tenants

FAQ

Your Phase I questions, answered.

Plain answers for buyers, lenders and attorneys.

What is a Phase I ESA?

A Phase I Environmental Site Assessment reviews a property's history, records and current condition to find likely contamination. Ours follow ASTM E1527-21 and are completed under the oversight of our technical director, a licensed Professional Geologist.

How long does a Phase I take?

Usually about 15 business days. Working to a tight closing date? Tell us on the scoping call and we'll schedule around it.

How much does a Phase I cost?

It depends on property size, past use, number of buildings and turnaround. You get a fixed-scope, fixed-fee proposal before any work starts, with no surprise add-ons.

What is a REC?

A Recognized Environmental Condition: evidence that hazardous substances or petroleum have been, or are likely to have been, released at the property. We explain what each one means for your deal.

When do I need a Phase II?

Only when the Phase I identifies a REC worth testing. Our team samples soil, groundwater or soil vapor and reports findings before closing.

Will my lender accept the report?

Yes. Our reports meet lender requirements and EPA's All Appropriate Inquiries (AAI) rule, which supports CERCLA liability protection.

What happens if you find something mid-deal?

We scope it, price it and lay out your options, from targeted testing to remediation under the right state regulatory program, so your transaction keeps moving.

ONE Environmental field team on site

We advocate for our clients

Know the risk. Know the cost. Close with confidence.

Creative solutions, from site assessment through remediation and closure.

804-303-8784

NEXT DAY RESPONSE

Get a Phase I quote

  • Fixed-scope, fixed-fee quote
  • ASTM E1527-21 compliant reports
  • Timed to your closing date
Call Get a Quote